Executive Summary
This document summarises the content and scientific objectives of the Divertor Tokamak Test facility (DTT) Research Plan, currently under construction at the ENEA site in Frascati, Italy. Designed with breakeven-class performance and dimensionless parameters close to ITER and DEMO, DTT addresses the heat exhaust challenge in fusion reactors across three operational phases. Key research areas include the exploration of advanced divertor configurations, detached regime control, power decay length scaling, ELM mitigation, wall erosion, and energetic particle physics.
Analysis Confidence: High
ST_CODE: ITTED1
System Metadata
Source ID
DOC-20250316
Process Date
Public archive record
Integrity Hash
SHA256-20250316IAEA...
Indexer Status
COMPLETE
Initializing_Secure_Viewer...
Full Transcript
Transcript
Page 1 of 2
Page 1 - Introduction and Machine Parameters
Topic: OV
THE DIVERTOR TOKAMAK TEST FACILITY RESEARCH PLAN
P. MARTIN0,1, C. ANGIONI2, S. BREZINSEK3, F. CRISANTI4, C. DAY5, G. DOSE6, M.V. FALESSI7,10, G. GIRUZZI8, P. INNOCENTE11, P. MANTICA9, E. NARDON8, C. SOZZI9, D. TERRANOVA0,11, E. TSITRONE8, D. VAN EESTER3, P. VINCENZI0,11, G. VLAD7, M. WISCHMEIER2 AND THE DTT CONTRIBUTORS12
0Consorzio RFX, corso Stati Uniti 4, 35127 Padova, Italy
1University of Padova, Dipartimento di Fisica e Astronomia, Padova, Italy
2Max-Planck-Institut für Plasmaphysik, D-85748 Garching, Germany
3Forschungszentrum Jülich GmbH, Institut für Energie- und Klimaforschung—Plasmaphysik, 52425, Jülich, Germany
4University of Tuscia, Via del Paradiso 47, 01100 Viterbo Italy
5Kyoto Fusioneering, Tokyo, Japan
6General Atomics, PO Box 85608, San Diego, CA 92186-5608, United States of America
7ENEA via E. Fermi 45, 00044 Frascati, Italy
8CEA, IRFM, F-13108 Saint Paul Lez Durance, France
9ISTP-CNR, via R. Cozzi 53, 20125 Milano, Italy
10Istituto Nazionale di Fisica Nucleare (INFN), Sezione di Roma, Piazzale Aldo Moro 2, Roma, Italy
11ISTP-CNR, Corso Stati Uniti 4, Padova, Italy
12DTT S.c.a r.l., Via E. Fermi 45, Frascati, Italy
Email: [email protected]
This paper summarises the content of the Divertor Tokamak Test facility (DTT) Research Plan [1]. DTT, presently under construction in the Frascati (Italy) ENEA site, will be a device with breakeven class performance, which is designed to address one of the main challenges towards the construction of a fusion power plant, i.e., the development of credible solutions for the heat exhaust.
The Research Plan describes the objectives and research strategy of the DTT experiment [2,3], and proposes a set of programmatic headlines of its scientific programme. The activity for the preparation of the DTT Research Plan (DTT-RP) has been performed during the past three years by an international team comprising approximately 100 European fusion scientists belonging to 20 research institutes from 10 different countries. The RP will be regularly updated and will catalyse and guide the research activities in preparation of the experimental phase.
The Research Plan is based on the expected performance of DTT, which will be one of the world most advanced tokamaks in the next decade. The main parameters of DTT are shown in Fig. 1. DTT is equipped with full W actively cooled plasma facing components and has the capability of investigating various divertor configurations. Its compact size and large auxiliary heating power allow to simulate DEMO divertor heat loads and to produce ITER/DEMO relevant plasmas. Moreover, as shown in Fig. 2, DTT has relevant dimensionless parameters as close as possible to those typical of ITER & DEMO-class reactors. For instance, it has a key wall load parameter PSOL/R ~ 15 (ratio of power flowing out the SOL to major radius); simultaneous high edge density and low collisionality; scrape-off layer width of the same order as for ITER and DEMO; ITER/DEMO relevant core confinement properties. In 2024, the EUROfusion Facilities Review report stressed the potential of DTT "for major impact on the design of DEMO", as a device "ideal for testing ITER and DEMO scenarios in relevant conditions". Based on these considerations, DTT was classified by the Facilities Review international panel as one of the few "indispensable" tokamak facilities of the future European fusion programme, without which "the programme goals cannot be realized on the required timescale".
The DTT-RP is an extensive document (~200 pages) organized in nine chapters and nine technical appendices, which provide a synthetic description of the device main characteristics. The DTT programme which emerges from the RP will follow the evolution of the machine along three distinct phases, as illustrated in Fig. 3, taken from [4].
[Fig. 1: DTT main design parameters:
R (m) = 2.19
a (m) = 0.7
Volume (m³) = 35
Ip (MA) = 5.5
BT (T) = 5.85
ne (10²⁰ m⁻³) = 1.5
PTOT (MW) = 45
PECRH (MW) = 29
PICRH (MW) = 6
PNNBI (MW) = 10]
[Fig. 2: DTT dimensionless parameters, taken from [4]]
Frequently Asked Questions
What is this document? ▾
This document summarises the content and scientific objectives of the Divertor Tokamak Test facility (DTT) Research Plan, currently under construction at the ENEA site in Frascati, Italy. Designed with breakeven-class performance and dimensionless parameters close to ITER and DEMO, DTT addresses the...