This document provides the tentative experimental schedule and comprehensive technical overview of the WPTE tokamak devices (AUG, MAST-U, TCV, and WEST) for the 2026–2027 proposal period. It details planned operational campaigns, maintenance shutdowns, core device parameters, heating systems, control capabilities, diagnostic upgrades, and divertor testing configurations.
Analysis Confidence: High
ST_CODE: ES2627

System Metadata

Source ID

DOC-ANNEX2-O

Process Date

Public archive record

Integrity Hash

SHA256-ANNEX2OVERVI...

Indexer Status

COMPLETE

Initializing_Secure_Viewer...
[ DOWNLOAD_ORIGINAL_ASSET ]

Full Transcript

Transcript

Page 1 of 9

Annex 2: Tentative schedule and Overview of the WPTE devices for 2026-2027 (Page 1)

Annex 2: Tentative schedule and Overview of the WPTE devices for 2026-2027 The figure below gives an overview of the tentative timeline of the WP TE devices involved in the present call for proposals 2026-2027. AUG, MAST-U, TCV and WEST are all expected to operate over the period. Note that the timeline shown below is only indicative, and subject to modifications, in particular for 2027 where it is highly tentative at this stage. It gives however an overview of the expected running time. [Figure 1 : tentative timeline for the WP TE devices over 2026-2027] Legend: Engineering break | Restart | Physics campaign - AUG: - 2026: Physics campaign (Jan-Jul), Shutdown (Aug-Oct), Physics campaign (Nov-Dec) - 2027: Physics campaign (Jan-Jul), Shutdown (Aug-Oct), Physics campaign (Nov-Dec) - MAST-U: - 2026: MU-05 campaign (Jan-Apr), Long shutdown (May-Dec) - 2027: Shutdown (Jan-Dec) - TCV: - 2026: Physics campaign (Jan-Jun), Shutdown TBLLD (Jul-Sep), TBLLD Physics campaign (Oct-Dec) - 2027: Shutdown (Jan), Physics campaign (Feb-Dec) - WEST: - 2026: Shutdown (Jan-mid Apr), C13 Physics campaign (mid Apr-Jul), Engineering break (Aug), C14 Physics campaign (Sep-Nov), Shutdown (Dec) - 2027: Shutdown (Jan-mid Apr), C15 Physics campaign (mid Apr-Jul), Engineering break (Aug), C16 Physics campaign (Sep-Nov), Shutdown (Dec) Detailed comments can be found below. • AUG - Plasma operation is planned to restart in early 2026, after the 2025 shutdown is completed. A ~6 months campaign is planned to follow until end of July 2026. - A ~3 months shutdown is then planned until November 2026, with plasma operation extending from November 2026 until July 2027. - A similar scheme is planned in 2027, with a 3 months shutdown followed by plasma restart in November 2027. • MAST-U - The MU-05 campaign is planned to start in 2025 and to extend until April 2026. - A long shutdown is then planned over the rest of 2026 and 2027 for major upgrades of the device. • TCV - Operation is planned throughout the first part of 2026 with a ~3 months shutdown planned in July 2026 to install the Tight Baffle Long Leg Divertor (TBLLD) - A dedicated ~3 months campaign with a focus on the TBLDD will follow until end of December 2026, followed by a ~1 month shutdown to remove the TBLDD in early 2027.

Frequently Asked Questions

What is this document?
This document provides the tentative experimental schedule and comprehensive technical overview of the WPTE tokamak devices (AUG, MAST-U, TCV, and WEST) for the 2026–2027 proposal period. It details planned operational campaigns, maintenance shutdowns, core device parameters, heating systems, contro...