Primary Intelligence Asset
Project Hydrus – AWE Aldermaston's proposed new hydrodynamics research facility
Declassified Public record OCR verified
INTEL
Executive Summary
This briefing note examines the UK Ministry of Defence's planning application for Project Hydrus, a proposed high-capability hydrodynamics research facility at AWE Aldermaston. It outlines the facility's scientific role in nuclear warhead research and development, cost implications, environmental impact exemptions, and tensions with the Comprehensive Test Ban Treaty (CTBT), while arguing that the project should be cancelled in favor of non-proliferation and spending restraint.
Analysis Confidence: High
ST_CODE: ST2010
Full Document Transcript & Forensic Extraction
System Metadata
Source ID
DOC-NIS-PROJ
Process Date
Public archive record
Integrity Hash
SHA256-NISPROJECTHY...
Indexer Status
COMPLETE
Initializing_Secure_Viewer...
Full Transcript
Transcript
Page 1 of 10
Page 1 - Background
NIS briefing note
August 2010
Project Hydrus – AWE Aldermaston's proposed new hydrodynamics research facility
A briefing from Nuclear Information Service
Background
On 16th July 2010 the Ministry of Defence submitted a planning application to West Berkshire Council for construction of a new hydrodynamics research facility at the Atomic Weapons Establishment (AWE) Aldermaston (planning reference 10/01695/COMIND)1.
The new facility, known as Project Hydrus by AWE's planners, is the latest development in AWE's site development strategy for modernising and rebuilding the facilities needed to manufacture Britain's nuclear weapons. Design and preparation work on the project has been underway for the last ten years and, after a series of delays, has now reached the planning application stage. The new facility will increase AWE's hydrodynamics research capabilities and will complement and eventually replace the work of a number of smaller existing facilities.
West Berkshire Council intends to come to a decision on the Project Hydrus planning application within three months of its submission date. This means the application is likely to be determined at a meeting of the Council's Eastern Area Planning Committee in September2. As has been the case for previous planning applications at AWE, the application has been submitted so that consultation will take place over a holiday period when it is likely to attract less attention than otherwise. AWE has made no effort to seek opinions on the proposed development from local residents and the wider public before submitting the planning application.
Key information about the proposed new facility, its impacts, and the risks it poses will be withheld from the public because the Secretary of State for Communities and Local Government has granted the Ministry of Defence exemption from preparing an environmental impact assessment for the development.
1 West Berkshire Planning Applications web portal: planning application 10/01695/COMIND for “Replacement hydrodynamics research facility including an operations building with lightning protection system, a support building, an electrical substation, and associated landscaped areas including a Sustainable Drainage System together with construction related infrastructure including access roads, construction compound, fencing, gates and ancillary facilities.” http://bit.ly/cl3Usq
2 Meetings of the Eastern Area Planning Committee are scheduled to take place on 8th September and 29th September 2010.
Frequently Asked Questions
What is this document? ▾
This briefing note examines the UK Ministry of Defence's planning application for Project Hydrus, a proposed high-capability hydrodynamics research facility at AWE Aldermaston. It outlines the facility's scientific role in nuclear warhead research and development, cost implications, environmental im...