Primary Intelligence Asset

India’s Military Plutonium Inventory, End 2004

Declassified Public record OCR verified
INTEL

Executive Summary

This report by David Albright evaluates India's inventory of separated weapon-grade plutonium through the end of 2004 using a Monte Carlo uncertainty analysis. It details production from the Cirus and Dhruva heavy water reactors at BARC, accounts for civil and test draw downs, and calculates a median net military inventory of approximately 445 kilograms. This stockpile is estimated to be sufficient for an upper-bound equivalent of roughly 85 nuclear weapons.
Analysis Confidence: High
ST_CODE: TONIUM

System Metadata

Source ID

DOC-INDIA_MI

Process Date

Public archive record

Integrity Hash

SHA256-INDIAMILITAR...

Indexer Status

COMPLETE

Initializing_Secure_Viewer...
[ DOWNLOAD_ORIGINAL_ASSET ]

Full Transcript

Transcript

Page 1 of 5

Introduction & Production Complex

India’s Military Plutonium Inventory, End 2004 By David Albright ISIS May 7, 2005 Estimating the size of India’s inventory of separated weapon-grade plutonium has become more difficult following its nuclear tests in May 1998. India treats this number as highly classified, partly because such estimates provide a direct indication of the number of nuclear weapons it may possess. The purpose of this report is to summarize estimates of its stock of weapon-grade plutonium. A companion report discusses India’s highly enriched uranium stock. Production Complex At the core of India’s production of plutonium for nuclear weapons are two relatively small heavy water-moderated reactors and a plutonium separation plant at the Bhabha Atomic Energy Center (BARC) in Mumbai. The two reactors use natural uranium metal fuel and produce weapon-grade plutonium. The uranium metal fuel for these reactors is also produced at BARC. Cirus Reactor The 40 megawatt-thermal (MWth) Cirus reactor first went critical in 1960. This reactor, which was supplied by Canada, operated until 1997 when it shut down for major renovations because of aging problems. India considered building a new reactor to replace Cirus, but decided against that option for cost reasons. After extensive modification, the reactor restarted in October 2003 and reached full power in November 2004. Indian officials expect Cirus to last for about 15 more years. Dhruva Reactor The 100 MWth Dhruva reactor, which was developed indigenously, went critical in August 1985. Soon after starting operation, the reactor experienced severe vibrations in the reactor core and was shut down for modifications. In December 1986, it resumed operation at quarter power. In January 1988, the vibration problem was solved and the reactor attained full power. Trombay Plutonium Separation Plant India started the Trombay plutonium separation plant in 1964 to reprocess irradiated fuel from the Cirus reactor. It was shut down in 1974 for renovation and expansion and restarted in 1983 or 1984. After renovation, Trombay was able to process fuel from both the Cirus and Dhruva reactors. While this plant was closed, Cirus’ irradiated fuel was processed at the Prefre reprocessing plant north of Mumbai that began operation in 1979.

Frequently Asked Questions

What is this document?
This report by David Albright evaluates India's inventory of separated weapon-grade plutonium through the end of 2004 using a Monte Carlo uncertainty analysis. It details production from the Cirus and Dhruva heavy water reactors at BARC, accounts for civil and test draw downs, and calculates a media...