Primary Intelligence Asset
niac 2012 phaseii slough fusiondrivenrocketneclearpropulsiontagged
Declassified Public record OCR verified
INTEL
Executive Summary
Title of Grant / Cooperative Agreement:
Type of Report:
Name of Principal Investigator:
Period Covered by Report:
Name and Address of recipient’s institution:
NASA Grant / Cooperative Agreement Number:
Reference 14 CFR § 1260.28 Patent Rights (abbreviated below)
The Recipient shall include a list of any Subject Inventions required to be disclosed during the preceding year in the performance
report, technical report, or renewal proposal. A complete list (or a negative statement) for the entire aw...
Analysis Confidence: High
ST_CODE: TAGGED
Full Document Transcript & Forensic Extraction
System Metadata
Source ID
DOC-NIAC_201
Process Date
Public archive record
Integrity Hash
SHA256-NIAC2012PHAS...
Indexer Status
COMPLETE
Initializing_Secure_Viewer...
Full Transcript
Transcript
Page 1 of 116
Page 1
Title of Grant / Cooperative Agreement:
Type of Report:
Name of Principal Investigator:
Period Covered by Report:
Name and Address of recipient’s institution:
NASA Grant / Cooperative Agreement Number:
Reference 14 CFR § 1260.28 Patent Rights (abbreviated below)
The Recipient shall include a list of any Subject Inventions required to be disclosed during the preceding year in the performance
report, technical report, or renewal proposal. A complete list (or a negative statement) for the entire award period shall be included in
the summary of research.
Subject inventions include any new process, machine, manufacture, or composition of matter, including software, and improvements to,
or new applications of, existing processes, machines, manufactures, and compositions of matter, including software.
Have any Subject Inventions / New Technology Items resulted
No Yes
from work performed under this Grant / Cooperative Agreement?
If yes a complete listing should be provided here:
Details can be provided in the body of the Summary of Research
report.
Reference 14 CFR § 1260.27 Equipment and Other Property (abbreviated below)
A Final Inventory Report of Federally Owned Property, including equipment where title was taken by the Government, will be submitted
by the Recipient no later than 60 days after the expiration date of the grant. Negative responses for Final Inventory Reports are
required.
Is there any Federally Owned Property, either Government
No Yes
Furnished or Grantee Acquired, in the custody of the Recipient?
If yes please attach a complete listing including information as set
forth at § 1260.134(f)(1).
Attach the Summary of Research text behind this cover sheet.
Reference 14 CFR § 1260.22 Technical publications and reports (December 2003)
Reports shall be in the English language, informal in nature, and ordinarily not exceed three pages (not counting bibliographies,
abstracts, and lists of other media).
A Summary of Research (or Educational Activity Report in the case of Education Grants) is due within 90 days after the expiration date
of the grant, regardless of whether or not support is continued under another grant. This report shall be a comprehensive summary of
significant accomplishments during the duration of the grant.
Frequently Asked Questions
What is this document? ▾
Title of Grant / Cooperative Agreement:
Type of Report:
Name of Principal Investigator:
Period Covered by Report:
Name and Address of recipient’s institution:
NASA Grant / Cooperative Agreement Number:
Reference 14 CFR § 1260.28 Patent Rights (abbreviated below)
The Recipient shall include a list of...