SST-Bharat
SST-Bharat
01 Executive_Summary
Steady-state Superconducting Tokamak-Bharat - proposed fusion-fission hybrid reactor (130 MW total power), cost Rs 25,000 crore (~$3 billion).
03 Deep_Dive_Intelligence
Intelligence Summary: SST-Bharat
Node Identity: SST-Bharat is a entity categorized under "MCF" in the india intelligence graph. Steady-state Superconducting Tokamak-Bharat - proposed fusion-fission hybrid reactor (130 MW total power), cost Rs 25,000 crore (~$3 billion).
Research Evidence: The following findings from 1 research document reference this entity:
- Ajit Kumar Mohanty visited IPR and outlined future direction for the Indian Fusion Program with SST-Bharat, encouraging faculty toward "revival of SST-1." (Source: https://www.ipr.res.in/newsletter/2025-NL-3-140/NL_Mar_2025_HQ.pdf) ### Assessment: India's tokamak program is functional but significantly behind international state-of-the-art.
- Confidence: ESTABLISHED --- ## L2: SST-Bharat and India's Fusion Power Roadmap ### Finding: IPR has proposed a multi-stage roadmap for Indian fusion power, culminating in a DEMO reactor by 2060.
- The key intermediate device is SST-Bharat (Steady-state Superconducting Tokamak-Bharat), envisioned as a fusion-fission hybrid reactor with 130 MW total power (100 MW from fission, 30 MW from fusion), at an estimated cost of Rs 25,000 crore (~$3 billion).
Strategic Relevance: SST-Bharat is a tracked entity within the india network. With 2 documented connections to other entities, this node plays a supporting role in the network topology.
Network Linkage: This entity maintains 2 documented connections in the intelligence network: SST-Bharat succeeds ADITYA-U; IPR proposes SST-Bharat.
Source Documents: Evidence compiled from: FINDINGS_FROM_research-prompts-round73.md.
04 Network_Linkage
This entity maintains 2 documented connections in the intelligence network: SST-Bharat succeeds ADITYA-U; IPR proposes SST-Bharat.
07 Key_Findings
- ▸ ### Intelligence Summary: SST-Bharat **Node Identity:** SST-Bharat is a entity categorized under "MCF" in the india intelligence graph.
- ▸ Steady-state Superconducting Tokamak-Bharat - proposed fusion-fission hybrid reactor (130 MW total power), cost Rs 25,000 crore (~$3 billion).
- ▸ **Research Evidence:** The following findings from 1 research document reference this entity: 1.
10 FAQ
What is SST-Bharat? ▾
What role does SST-Bharat play in the research network? ▾
What evidence supports the SST-Bharat assessment? ▾
What is known about SST-Bharat? ▾
What is SST-Bharat's role in the network? ▾
How does SST-Bharat fit into the broader intelligence network? ▾
What external sources document SST-Bharat? ▾
What are the open questions or unresolved issues about SST-Bharat? ▾
What is the historical timeline for SST-Bharat? ▾
What documents should I read to learn more about SST-Bharat? ▾
Citations 1
- [1]
Verified_Primary_Sources 2 SOURCES
Type: entity
Region: india
Last updated: Research database snapshot