ASDEX Upgrade
ASDEX Upgrade
01 Executive_Summary
Germany's largest tokamak, resumed operations November 2024 after two-year maintenance with new upper divertor and up to 19 MW heating power.
03 Deep_Dive_Intelligence
Intelligence Summary: ASDEX Upgrade
Node Identity: ASDEX Upgrade is a entity categorized under "MCF" in the germany intelligence graph. Germany's largest tokamak, resumed operations November 2024 after two-year maintenance with new upper divertor and up to 19 MW heating power.
Research Evidence: The following findings from 3 research documents reference this entity:
- ASDEX Upgrade, Germany's largest tokamak, resumed operations in November 2024 after a two-year maintenance period that installed a new upper divertor with internal coils (Doi and Doa), a high-capacity cryopump, and state-of-the-art diagnostics, enabling exploration of alternative divertor configurations for ITER and DEMO.
-
- Source: IPP press release: https://www.ipp.mpg.de/5532945/w7x - ASDEX Upgrade resumed operations November 2024 after two-year maintenance; new upper divertor with in-vessel coils (Doi and Doa) became operational spring 2025.
- Evidence: - "IPP operates the fusion devices ASDEX Upgrade (Garching) and Wendelstein 7-X (Greifswald), and is coordinator of EUROfusion and host to the EUROfusion Programme Management Unit." - Source: EUROfusion Germany member page: https://euro-fusion.org/eurofusion/members/germany/ - EUROfusion: "pan-European consortium with 30 members in 29 countries." EU allocated €5+ billion to fusion for 2021-2027.
- Zohm, H., et al, “Study of H–mode Physics on ASDEX Upgrade,” Proc.
- High-Zdivertor experiments have been conducted in both Alcator C–Mod and ASDEX Upgrade.
- ASDEX Upgrade uses tungsten coated graphite tiles in a high recycling baffled outer divertor.
Strategic Relevance: ASDEX Upgrade is a tracked entity within the germany network. With 3 documented connections to other entities, this node plays a supporting role in the network topology.
Network Linkage: This entity maintains 3 documented connections in the intelligence network: ASDEX Upgrade operated by IPP; ASDEX Upgrade divertor research ITER; IPP operates ASDEX Upgrade.
Source Documents: Evidence compiled from: FINDINGS_FROM_research-prompts-round71.md, SESSION_HANDOFF.md, GeneralAtomics DIII-D FiveYearPlan 1998.
04 Network_Linkage
This entity maintains 3 documented connections in the intelligence network: ASDEX Upgrade operated by IPP; ASDEX Upgrade divertor research ITER; IPP operates ASDEX Upgrade.
07 Key_Findings
- ▸ ### Intelligence Summary: ASDEX Upgrade **Node Identity:** ASDEX Upgrade is a entity categorized under "MCF" in the germany intelligence graph.
- ▸ Germany's largest tokamak, resumed operations November 2024 after two-year maintenance with new upper divertor and up to 19 MW heating power.
- ▸ **Research Evidence:** The following findings from 3 research documents reference this entity: 1.
10 FAQ
What is ASDEX Upgrade? ▾
What role does ASDEX Upgrade play in the research network? ▾
What evidence supports the ASDEX Upgrade assessment? ▾
What is known about ASDEX Upgrade? ▾
What is ASDEX Upgrade's role in the network? ▾
What primary source PDFs are available for ASDEX Upgrade? ▾
How does ASDEX Upgrade fit into the broader intelligence network? ▾
What external sources document ASDEX Upgrade? ▾
What is the historical timeline for ASDEX Upgrade? ▾
What documents should I read to learn more about ASDEX Upgrade? ▾
Citations 4
- [1]
- [2]
- [3]
- [4] (2024) — Max-Planck-Institut für Plasmaphysik / EUROfusion
Verified_Primary_Sources 3 SOURCES
Type: entity
Region: germany
Last updated: Research database snapshot